Tuesday, March 07, 2006 - The contractor repairing the emergency generators removed the electrical motor that generates emergency power from the generator at the Nursing/Allied Health Building today.
- The elevator maintenance contactor received all of the 1st floor doors for the elevators at the Lions/LSU Clinic Building. They also received the replacement pump that lifts the elevator that serves the cafeteria at the MEB. The installation of these parts will begin shortly.
|