Louisiana State University Health Sciences Center Administration & Finance
 

Monday, April 03, 2006

  • The three boiler feed water pumps in the MEB have been installed and are now operating.
  • The two chemical feed water pumps have also been installed at the MEB and are operating.
  • Two chilled water auxiliary pumps for the CSRB were delivered today. Installation will begin shortly.
  • The hot water recirculating pumps have been installed in the Lion's/LSU Clinic building. Some additional re-piping is still required and the electrical connections have yet to be made.
  • The contractor began the replacement of damaged fire alarm system components throughout the Nursing/Allied Health building today.
  • The Office of Facility Planning & Control has given the authorization to solicit prices for the permanent repairs to storm damaged windows in downtown campus buildings.
  • Environmental remediation work continues (removal of drywall, etc.) on the 1st floors of the Nursing/Allied Health Building and the Resource Center.