  • The contractor has finished taping and floating the new sheetrock that was installed in the two large MEB Lecture Rooms.
  • Due to commitments at the Superdome, the State Elevator Inspector was unable to conduct the inspections on the 2 remaining elevators at the Nursing/Allied Health Building as originally planned.  He will contact our elevator contractor when he is available and reschedule the inspections.
  • The installation of new sub-flooring is complete in all but one of the elevators in the Lions/LSU Clinic Building. The one remaining elevator will have its sub-floor replaced tomorrow.  
  • The freight elevator and the animal care elevators in the MEB must also have their sub-floors replaced. That work will occur tomorrow or Thursday. Those two elevators will be unavailable for use while the work is completed.