  • The contractor began painting the walls in the two large lecture halls in the MEB today.
  • The temporary power to the P-3 lab at 1542 Tulane Ave. is connected and is energized. The lab now has stable power. When the project to provide temporary power to the entire building is completed, the P-3 lab will be switched back over to the building power.
  • The control air compressor for the MEB has been delivered and will be installed soon.