Louisiana State University Health Sciences Center Administration & Finance
 

Thursday, September 14, 2006

  • 1542 Tulane Ave:
    • Entergy has finished installing their meters.
    • Ordes is closing all of the new panels and labeling the old and unused panels.
  • Campus Window Replacement:
    • The contractor has installed two more sets of doors at Residence Hall.
  • Dental School:
    • Pipe Insulation labeling/identification continues.
    • Repairs of the incinerator continue. The contractor has begun removing damaged controls & is replacing the 800K BTU burner.
    • The temporary-permanent emergency generator has been connected to the building systems.
    • The 24-hour response team was on site today making repairs to the temporary-temporary chiller which is not operating at full capacity.