Monday, November 06, 2006
- At 1542 Tulane, the sub-contractor was checking the plumbing in the basement for valves and preparing to fill the systems with water.
- LSUHSC staff noted that there was a crack in the main water line after the shutoff valve. This will need to be repaired before the shut off valve is opened.
- The installation of the conduit on the Bolivar St. side of Student Parking Lot 2 was almost completed when the heavy rain began to fall this afternoon. Depending on the weather, this installation should be completed on Tuesday.
- The leaks in the sprinkler system on the 2nd and 7th floors of the Dental School Clinic Building were repaired today.
|