  • At 1542 Tulane, the sub-contractor was checking the plumbing in the basement for valves and preparing to fill the systems with water. 
    • LSUHSC staff noted that there was a crack in the main water line after the shutoff valve.  This will need to be repaired before the shut off valve is opened. 
  • The installation of the conduit on the Bolivar St. side of Student Parking Lot 2 was almost completed when the heavy rain began to fall this afternoon.  Depending on the weather, this installation should be completed on Tuesday.
  • The leaks in the sprinkler system on the 2nd and 7th floors of the Dental School Clinic Building were repaired today.