Louisiana State University Health Sciences Center Administration & Finance
 

Monday, December 18, 2006

  • The elevator contractor at the Dental School was making repairs to the elevators in the Clinic Building today.
  • ACT arrived and inspected the tunnel connecting the Power Plant to the Dental School basement for the presence of any asbestos and of chlorine in the piping.
  • The boiler manufacturer was on site at the Dental School to begin to inspect the boilers to determine what repairs may be necessary.   They will come back to open up the boilers to inspect the fire side as well as the water side.