  • The contractor at 1542 Tulane Ave. is running conduit for the electrical wiring to the disconnects for the new basement sump pumps.
    • The crane was on site to day and removed the old transformers from the 1542 Tulane Ave. basement. 
    •  The six old transformers are now in the Lakeside lot waiting to be picked up.
    • The mechanical sub-contractor has made arrangements for the basement drain connecting to the city sewer to be cleaned out.
    • The eleva to r repair crew continued working on the eleva to rs in the rear of the building.
    • The water treatment contrac to r inspected the chemical feed pots for the chilled water and heating water loops.
  •   At the Dental School , the eleva to r contrac to r is still working to install the freight eleva to r car doors, counter weights, and track.