  • Additional floor tile was installed on the ramp from the MEB atrium leading to the 3rd floor elevator lobby in the Nursing/Allied Health Building and in a portion of the elevator lobby.
    • All of the new light fixtures have been installed and are operating in the atrium.
  • The old motor control center has been removed from the Dental School Power Plant.
  • The remaining ceiling tile has been removed from the 4th floor of the Administration Building at the Dental School .  This completes the removal of all ceiling tile in both buildings.