1542 Tulane Ave. :

  • Ordes Electrical continues to remove the damaged motor controls from the basement in preparation for the installation of the replacements.
  • Stratos Elevator is installing the safeties on Elevator #3. 
  • Arc Mechanical is making repairs to the ETS cabinets.

Dental School :

  • Frischhertz is working in the elevator penthouse of the Administration Building.  They are installing the conduit for the elevator disconnects needed by Schindler Elevator to continue with the repairs to the three elevators in the building.
  • Schindler is also working in the elevator penthouse of the Clinic Building.
  • Zimmer continues with the demolition of the A and B auditorium's in the Administration Building. 
  • Boe-Tel continues to make progress on the installation of the new cable trays on the 3rd, 4th and 5th floors of the Clinic Building . 
  • Coastal Air Balance is testing the air handling rooms; checking the flow of air at each unit, the temperature at the damper's, the chilled water supply and return in the system, and the thermostats.