Louisiana State University Health Sciences Center Administration & Finance
 

Friday, September 28, 2007

Dental School:

  • The dry wall on all of the 1st Floor walls in the Clinic Building have been taped and floated and most are painted
    • The curved wall at the reception desk has not been painted at this time.
    • The ceiling grid is being installed throughout 1st floor.
  • Landis has completed the punch list items on the Central Sterilization project and the architect will verify.
    • The valves for the sterilizer were repositioned and the additional air line was installed.
  • Entergy installed the electric meter and restored the service for the parking lot controls.
1542 Tulane Ave.:
  • Stratos Elevator started installing the door guides for Elevator #8 on floors 6 through 8.