Louisiana State University Health Sciences Center Administration & Finance
 

Wednesday, October 03, 2007

Dental School:

  • All of the lights have been installed in the Clinic Building 1st floor lobbies except for the indirect lights that will be located on top of the fur downs.
  • Siemens continues to run wire for the controls of the HVAC system that will serve the 1st Floor of the Clinic Building.
  • The repairs to the LSU School of Dentistry sign are complete.  The missing “L” has been  installed and all of the back lighting has been repaired. 
  • Schindler continues to work on repairing the controls for the freight elevator and installing the alarm bells for Elevators #6 and #7. 
  • The sanitization of the reverse osmosis system began today and should be completed by the end of the week. 
  • The bid for the permanent repairs to the roofs of the main Dental School campus buildings will be advertised this week.  An expedited bid period will be used to help move the project forward as quickly as possible.

 Landscaping Project:

  • The crews installed the nozzles on sprinklers located on stations 4 & 5.
    • Stations 4 & 5 were programmed to operate automatically on the controller.
  • The planting has begun on the Gravier St. side of the Allied Health/Nursing Building.  
    •  New trees have been planted.
    •  Crews also began installing bushes/shrubs in the planting beds along the Gravier St. side of both the MEB and the Allied Health/Nursing Building.