Louisiana State University Health Sciences Center Administration & Finance
 

Monday, December 10, 2007

1542 Tulane Ave. :

  • Stratos Elevator continues to work on Elevator #1; installing the new frame rails.
  • Zimmer is cleaning the ducts on the 4th Floor.
    • The cleaned ducts on the 6th Floor passed the visual inspection. 
    • The sampling in the ducts on the 6th Floor is underway. 
  • The contractor is still removing carpet from areas on the 4th Floor.
  • Zimmer continues to remove debris from the 4th Floor.
  • The old ceiling tile is being removed on the 6th Floor. 
  • The contractor is removing peeling paint and cleaning on the 7th Floor.

MEB Roof Replacement:

  • The majority of the gravel has been removed from the roof. 
  • New flashing was installed on of the four stairwells around their respective exhaust fans. 
  • The contractor is currently working on the elevator penthouse roof.

Dental School :

  • Zimmer removed the old chiller from the Power Plant.   
  • Landis continued working on the punch list for their work in the Clinic Building lobby.
  • The preconstruction meeting for the construction of the temporary bookstore was held today.

Landscaping Project:

  • Crews continued installing the irrigation system components on the S. Roman St. side of the MEB at the entrance/exit to the loading dock/service area.