1542 Tulane Ave.:

  • Stratos Elevator finished work on Elevator #2 cables.
    • They built the platform for Elevator #1 for debris removal and continued to remove debris from other elevators.
  • Zimmer-Eschette is cleaning the 8th Floor and cutting sheetrock in 3 places on the 8th Floor.
  • The contractor is removing carpet on the 5th Floor.
  • Zimmer continues to remove debris from the 4th Floor.
  • AEC is sampling the 1st floor center hall for mold and 4 rooms for lead paint.

Dental School :

  • Landis finished installing the wall base in the Clinic Building lobby. 
  • The material to be used to wrap the lobby column was delivered and the contractors began the installation.
  • Schindler started to install the new car station in Elevator # 3.

Landscaping Project:

  • The crews removed old vegetation along the S. Roman St. side of the MEB at the entrance to the service area.