Louisiana State University Health Sciences Center Administration & Finance
 

Wednesday, January 30, 2008

1542 Tulane Ave.:

  • Siemens continues to test and stabilize the fire alarm wiring in the elevator penthouse.
  • Stratos Elevator continues to install the new cab walls for Elevator #1.
  • The remediation contractor (Zimmer) continues to seal the cleaned ducts on the 5th Floor.
  • Zimmer continues to remove debris from the 2nd Floor in the rear of the building.
  • Zimmer also continues to clean on the 2nd Floor in the offices along the main (center) corridor.
  • The painting contractor continues to paint in Suite 123 and is priming on the 7th Floor.
    • The contractor is also floating the walls on the 5th Floor.
  • Trison Contructors finished installing the electrical service and connections in all of the network closets.
  • Boe-tel continues to terminate the new network wiring on the 7th Floor.

Dental School :

  • Needham Roofing removed the old roofing material and installed the first ply on the remaining portion of the Clinic Building roof today. 
    • They continued to work on the flashing and sealing around the penetrations through the roof. 
  • Sherlocks Construction finished painting the new interior walls of the temporary bookstore.
  • Securitas installed new security cameras on the Administration Building facing the Power Plant and the parking lots in the rear of the property.
    • They are working on the installation of the cameras for the Clinic Building . 
    • The conduit and wiring have been run and the posts where the cameras will be mounted are set.
  • Pflueger Electric supplied power to the parking gate on the east side of the Dog Kennel.