Louisiana State University Health Sciences Center Administration & Finance
 

Monday, January 07, 2008

Dental School :

  • In the temporary bookstore, the contractor worked on disconnecting the electrical wiring in the demolished walls.
    • They are removing the metal stud wall from the interior of the new bookstore space.
  • Schindler began wiring the selector magnet and the program controller for both Elevators # 3 and #4.

1542 Tulane Ave.:

  • Ordes continues to work on the punch-list items and making panel schedules.
  • Siemens resumed the installation of new fire alarm wires on the 8th Floor for the new fire alarm speakers and strobe boxes.
  • Stratos Elevator is wiring the car for Elevator #8.
  • Zimmer-Eschette continues to remove building debris from the 3rd Floor.
  • Zimmer-Eschette continues to clean the center corridor of the 4th Floor.
  • The contractor continues to remove floor tiles on the 7th and 8th Floor during the evening hours.
  • Exterior Lighting Project:
    • The electrical contractor broke out some plaster when removing six lights under the MEB on the corner of Bolivar and Perdido.
      • They have started installing the new lights, but will not be able to finish them until the plaster is replaced.
      • All of the new bollard lights lining the sidewalks on the downtown campus have been installed and are working.
  • New can lights are being installed at the Resource Center.