Monday, February 11, 2008 1542 Tulane
Ave.:
- Stratos
Elevator continues to work on the safeties for Elevator #1 and the controls for
Elevator #8.
- Siemens
continues to work on the new fire alarm devices.
- Zimmer
is coating the ducts on the 2nd Floor with an anti-microbial solution and is
sealing the access holes that were cut into the 2nd Floor ducts.
- Zimmer
continues to remove building debris.
- Zimmer
finished removing the peeling paint and cleaning on the 7th Floor in the rear
of the building on the Charity Hospital side.
- A
visual inspection is being scheduled.
- The
contractor has started prepping the 6th Floor for cleaning.
- Zimmer
continues to remove the floor tile in the "A section" (over the
garage) on the 3rd Floor.
- The
painting contractor continues to cut-in with the finish paint on the 5th and
6th Floors.
- Boe-tel
pulled new network wires from office stations to the new network closet on the
1st Floor.
Dental School
- Needham Roofing began installing the flashing around the perimeter of the Administration Building roof.
|