Tuesday, March 18, 2008 1542 Tulane
Ave.:
- Stratos
Elevator is adjusting Elevator #8 for automatic use.
- They
are repairing the 4th Floor lobby elevator door for Elevator #2.
- Siemens
finished installing the smoke detectors in the shafts of Elevators #1, #2,
& #3.
- Siemens
has resumed the installation of new fire alarm wiring on the 2nd Floor in the center
corridor and along the Tulane Ave. side of the building.
- Zimmer-Eschette
finished cleaning on the 2nd floor (old section) on both sides of the building.
- Both
areas passed the visual inspection and were sampled.
- The
contractor began cleaning on the 1st floor (old section) on the Charity side of
the building and in the Shipping and Receiving area.
- The
contractor continues to sand and prepare the walls and new sheetrock on the 2nd
and 3rd Floors.
- The
contractor finished removing the floor tile on the 3rd Floor in the old section
of the building on the Charity side.
- The
area passed the visual inspection and was sampled.
- The
contractor is removing the floor tile on the 3rd Foor (old section) on the I-10
side.
- The
painting contractor finished applying the finish paint on the 4th Floor in the
corridor and offices along Tulane Ave. and along the center corridor.
- The
contractor also primed the offices in Suite 122 on the 1st Floor.
- The
contractor continues with the installation of ceiling tiles on the 6th and 7th
Floors and has begun installing tiles on the 5th Floor.
Dental School :
- Durr Construction finished grading the HDC Library (#180) and Daycare (#124) sites today.
- Concrete Busters continued removing the debris from the HDC Administration Bldg (#138).
- They also started removing the transite panels and siding from the HDC Allied Health Bldg (#119).
- Sherlock Construction installed the 2 x 4 recessed lights in the vestibule area outside the temporary bookstore and wired them to the circuit panel.
MEB Roof Replacement:
- Crawford continues vacuuming out the rain water that is trapped below the lightweight concrete insulation.
- The electrical sub-contractor has completed rerouting the electrical conduit below the roof for all but one section of the manifold that feeds the building exhaust.
- The roofing contractor has also completed installing the wood base around all the equipment that is mounted on the main roof.
Downtown Landscaping Project:
- Crews completed the installation of the irrigation station on the S. Roman St. side of the Residence Hall.
- They connected the control wires to the irrigation valves around the Residence Hall.
|