1542 Tulane Ave. :

  • Stratos changed the buffer for Elevator # 7.
  • The contractor is painting the handrails in Stairwell C (Center Corridor).
  • Trison continues sealing the ceiling holes in the main corridor on Floors 2 and 3.
  • Herman-Miller continues to install conference room furniture on the 4th through 7th Floors.
  • The contractor finished fire-caulking the mechanical room walls on the 2nd through the 8th Floors and is prepping the walls for paint.

MEB Trash Chute:

  • Zimmer completed the pre-treatment chemical wash last night in preparation for pressure washing the chute.

Downtown Landscaping Project:

  • The crews performed minor grading and weed removal before installing new centipede sod on the Perdido St. side of the MEB. 
    • Five pallets of sod were laid.
  • Irrigation station #16 was activated on the automatic controller to water the new sod.