Friday, May 16, 2008 1542 Tulane Ave. :
- Stratos finished installing the whisper-flex cable for Elevator #7.
- The Herman Miller Group is assembling and installing new furniture on the 5th and 6th Floors.
- The contractor is priming the construction walls on Floors 1 through 4.
- Merit Sprinkler completed the repairs for the dry-pipe system on the 8th Floor and has returned the system to service.
- Boe-Tel is installing the telecommunication ground wires for the network closets on the 1st, 3rd, and 4th Floors.
|