Louisiana State University Health Sciences Center Administration & Finance
 

Tuesday, May 20, 2008

1542 Tulane Ave. :

  • Stratos is installing the cab roof for Elevator #7.
  • Zimmer-Eschette continues to remove the floor tile from the vestibule of the auditorium and in the loft of Room 108A.
  • Zimmer-Eschette continues to clean Room 109H and 108 behind Elevators #1, #2, and #3.
  • The contractor is installing the doors in the construction walls on Floors 1 - 8.
    • The contractor is painting the construction walls on Floors 5 - 8.
  • Boe-Tel finished testing the switch for the 1st Floor network closet and is terminating the telephone feeder cable.

Dental School :

  • Needham continued installing the turn-bars above the perimeter flashing on the Clinic Building roof. 
    • They have completed caulking the pre-cast joints on the penthouse and the parapet walls.