Tuesday, May 20, 2008 1542 Tulane Ave. :
- Stratos is installing the cab roof for Elevator #7.
- Zimmer-Eschette continues to remove the floor tile from the vestibule of the auditorium and in the loft of Room 108A.
- Zimmer-Eschette continues to clean Room 109H and 108 behind Elevators #1, #2, and #3.
- The contractor is installing the doors in the construction walls on Floors 1 - 8.
- The contractor is painting the construction walls on Floors 5 - 8.
- Boe-Tel finished testing the switch for the 1st Floor network closet and is terminating the telephone feeder cable.
Dental School :
- Needham continued installing the turn-bars above the perimeter flashing on the Clinic Building roof.
- They have completed caulking the pre-cast joints on the penthouse and the parapet walls.
|