Dental School :

  • Needham Roofing tore off and replaced 5 and one half squares of material on the main roof of the Clinic Building .
    • Supplies were also received to re-caulk the joints in the pre-cast panels of the penthouse and parapet walls.
  • The pre-bid conference for the project to renovate the A and B auditoriums was held today.

1542 Tulane Ave. :

  • Stratos is changing out the lobby door hardware for Elevator #7 on Floors 5 though 8. 
  • The air samples taken for the 1st Floor side entrance and elevator lobby in the old section of the building passed, so the area will be open tomorrow morning.
    • Asbestos cleaning is complete in the rooms off the 1st Floor hallway. These will be sampled tomorrow.
  • The contractor is finished painting on Floors 2 through 8. They are doing cut in work on the 1st Floor.
  • Royerre Commercial Carpet continues to install cove base and transition strips on the 1st and 2nd Floors.