Louisiana State University Health Sciences Center Administration & Finance
 

Thursday, May 8, 2008

NOTICE: On Saturday, May 10th and Sunday, May 11th from 7 AM until 6 PM each day, a contractor will be core drilling the floors on 6 and 7 in the Lions/LSU Clinics Building.  Core drilling is the process of drilling holes large enough for pipes to be run through a concrete slab.  In the case of the Lions/LSU Clinics Building, the slab is a post-tension type.  Drilling through a post-tension slab can be dangerous.  Therefore, no one is allowed to occupy floors 5, 6 or 7 during the above times.  Furthermore, we strongly recommend that no one plan on occupying any floor in the Lions/LSU Clinics Building during these hours.  This work will provide the expanded infrastructure needed in this building related to the permanent repairs and mitigation project.

1542 Tulane Ave. :

  • Stratos continues to change the lobby door hardware for the elevator doors on Elevator #7.
    • The contractor is removing the old dismantled controllers from Elevator #7 and #8 from the penthouse.
  • The painting contractor continues to paint in Stairwell D in the old section of the building.
  • Royerre Commercial Carpet continues to install cove base and transition strips on the 1st and 2nd Floors.
  • Trison is sealing the ceiling holes in the main corridor on Floors 2 through 8.
  • Hogue is installing new light fixtures in the garage.

LE Mitigation

  • CMI continues to install the rough-in electrical work on Floors 2, 6 and 7.
  • The work on the mechanical systems on Floors 6 and 7 is also continuing.
  • The core drilling is scheduled for the upcoming weekend.