Louisiana State University Health Sciences Center Administration & Finance
 

Monday, September 15, 2008

 

1542 TULANE AVE.:

  • General contractor continued demolition in the 3rd floor annex.
  • Elevator contractor continued work on elevator #4.
  • Lighting contractor installed new light fixtures in the 1st floor Family Medicine offices.
  • Painting contractor continued painting stairwell and hallway ceilings.
  • Security contractor installed card reader for the front door access control and made final preparations for installation of new cameras at several locations.
  • Facility Services continued installing new fan coil units in 615, 616, and 617. Work continued roughing in plumbing in the 6th and 7th floor lounges for the new kitchenettes.
  • ORM insurance adjusters toured the building to document Hurricane Gustav damage.

DENTAL CAMPUS 6th and 8th FLOOR RENOVATIONS:

  • Mechanical Contractor continues to core in room 8405.

DENTAL CAMPUS AUDITORIUMS A & B RENOVATIONS:

  • Contractor continues to construct framing for ceiling in Auditorium B and is laying-out framing for the ceiling in Auditorium A.

LANDSCAPING & EXTERIOR WORK:

  • Landscaping contractor replanted storm damaged trees and reinstalled support cables.

LIBRARY COMMONS:

  • Plumbing contractor completed vent piping.
  • Electricians continue to install light fixture frames.
  • Contractor framed knee wall nearest to stairwell.

LIONS BUILDING MITIGATION:

  • Mechanical subcontractor is running lines for new Med Gas on the 6th floor simulation rooms; running supply duct on Bolivar/Gravier side of 6th floor; insulating heating hot water lines on Bolivar/CSRB side of 6th floor; insulating supply duct on Gravier side of 6th floor; rerouting existing waste lines below new ceiling height on 6th floor; and piping in the AHU in mechanical room on 1st floor on the Gravier/Bolivar side of the building.
  • Electrical subcontractor is terminating the wire to new panel boxes on the 2nd floor in new electrical room on the CSRB side; running new wire to electrical panels on the S. Preiur side of the building; and installing outlets in new lab area on the 7th floor.
  • Iron subcontractor was rained out today.
  • Contractor is painting the walls on new lab on 7th floor.

MEB 2nd FLOOR LOBBY RENOVATION:

  • Electrical subcontractor is running wire for outlets in new walls for medical and campus stores.

MDL-5 LAB RENOVATION:

  • Contractor continues installing casework (unistrut frame), installing LCD panel displays, and reinstalling gas line.

MEB 4th FLOOR CEILING REPLACEMENT:

  • Contractor installed all of the fire speakers and continues installing ceiling tiles.

RESIDENCE HALL LOBBY EXPANSION:

  • Facility Services relocated pool table and furniture to the balcony to allow flooring contractor to work.