  • The general contractor continued making wall repairs in Room 545 and started erecting scaffolding in the auditorium.  
  • The electrical contractor began installing new light fixtures in the parking garage. 
    • Preparations continue for installation of the new light fixtures in the 1st Floor lobby. 
  • The construction cleaning contractor continued cleaning offices on the 5th Floor that have failed inspection.
    • Crews are cleaning restrooms on the 6th and 7th Floors and started cleaning offices on the 1st Floor. 
  • LSUHSC Facility Services continued minor repairs on various floors.

 

DENTAL CAMPUS AUDITORIUMS A & B RENOVATIONS:

  • The general contractor removed the wood forms for the riser seating in Auditorium A. 
    • The contractor framed the final ceiling trough in Auditorium B. 
  • The electrical contractor installed wiring for the recessed can lights in Auditorium B.
    • They installed half of the conduit stub-ups for the power and data for the riser seating in Auditorium B.

 

LIBRARY COMMONS:

  • The contractor completed installation of the ceiling grid in the study area near the window wall.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The glass subcontractor installed interior framing for the windows on the north side of the 1st Floor. 
  • The mechanical subcontractor insulated exhaust lines in the 6th Floor Mens restroom.
    • They trimmed out the medical gas outlets boxes for the ceiling tile in the 6th Floor simulation labs.
  • The steel subcontractor welded clips on the 1st Floor of the stair tower.
  • The electrical subcontractor installed dimmer switches in the 6th Floor simulation rooms.
    • They installed for the projector in the lecture room on the north side of the 6th Floor.
    • Patch panels were installed in the 7th Floor network closet.  
  • The sprinkler subcontractor moved sprinkler heads out of the way of the new roll down fire door on the 5th Floor.
  • The contractor installed wall tiles in the restroom on the west side of the 6th Floor.
    • A crew installed the projector screen in the lecture room on the north side of the 6th Floor.
    • Additional door frames were installed on the west side of the 1st Floor.
    • Crews continued to plaster the CMU walls on the west and south side of the 1st Floor.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor moved the sprinkler valve on the west side of the lobby.  

 

MEB 6109 & 6148 LAB RENOVATIONS:

  • The contractor installed new ceiling grid.

 

RESIDENCE HALL LOBBY EXPANSION: