Friday, November 14, 2008

 

1542 TULANE AVE. :

  • The electrical contractor completed installing new light fixtures in the parking garage. 
    • Preparations continue for installation of the new light fixtures in the 1st Floor lobby. 
  • The construction cleaning contractor continued cleaning offices on the 5th Floor that have failed inspection.
    • They completed cleaning offices on the 1st Floor.
  • Facility Services continued minor repairs on various floors. 

 

DENTAL CAMPUS AUDITORIUMS A & B RENOVATIONS:

  • The general contractor installed support legs and the first tier of wood forming for the riser seating in Auditorium B. 
  • The contractor floated the sheetrock walls in Auditorium A and installed sheetrock for the ceiling trough along the south wall in Auditorium A.
  • The electrical contractor installed junction boxes for the sconces on the west wall in Auditorium A.
    • They installed the remaining power and data stub-ups for the riser seating in Auditorium B.

 

LIBRARY COMMONS:

  • The contractor installed a portion of the ceiling grid in the cafe area.
  • LSUHSC electricians installed light fixtures supports in the large multi media room.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The glass subcontractor installed interior window frames on the south, west, and north sides of the 1st Floor.
    • They installed curtain wall clips on the east side of the stairwell.
  • The mechanical subcontractor installed the temporary air intake line to the medical air equipment on the south side of the 1st Floor.
    • They insulated chill and heating hot water lines on the east side of the 1st Floor.
    • A crew installed control valves on the west side of the 6th Floor.
    • They wired VAV controls on the 6th Floor simulation rooms. 
  • The sprinkler subcontractor installed piping near the new fire pump on the south side of the 2nd Floor.
  • The contractor installed restroom wall tiles on the 6th Floor and primed the locations of the marker boards on the south side of the 6th Floor.

 

MEB 6109 & 6148 LAB RENOVATIONS:

  • The contractor removed existing counter tops in both rooms and installed the remaining ceiling tiles, light fixtures and diffusers.