  • The general contractor continued work on the ceiling grid in the 7th Floor hallway.
  • The construction cleaning contractor continued cleaning the stairwells and restrooms on all floors.
  • The elevator contractor continued removing the protective film on Elevator 7 and removed the plywood sheathing in Elevators 3 and 8. 
  • The furniture vendor continued installing cabinets in the lounge on the 7th Floor and set up Conference Rooms 728 and 756.
  • The network wiring contractor continued new data wiring on the 6th Floor. 
  • The window glass contractor continued replacing broken windows on all floors.
  • Facility Services continued minor repairs on various floors.

 

DENTAL CAMPUS AUDITORIUMS A & B RENOVATIONS:

  • The general contractor removed the concrete forms for the riser seating in Auditorium B and entry stairs in Auditorium A.
  • The mechanical contractor installed chilled water pipes to one of two AHUs. 
  • The general contractor sanded the walls in Auditorium A.    

 

EXTERIOR/LANDSCAPING:

  • Facility Services completed wiring connections for the bollard lights in front of 1542 Tulane Ave.

 

LIBRARY COMMONS:

  • The contractor finished the installation of the ceiling grid in the smaller multimedia room.
  • Siemens installed all but one of the new thermostats.    

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The mechanical subcontractor insulated chilled and heating hot water lines on the east side of the 1st Floor.
    • They continued installing pipe for the new medical air and vacuum compressors that will be installed on the 2nd Floor. 
  • The contractor grouted restroom wall tiles on the 6th Floor.
    • A crew installed door frames and glass on the north side of the 6th Floor.
    • Sheetrock is being hung in the freight elevator vestibule on the 6th Floor.
    • They continued to install CMU on the 1st Floor, southeast corner.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor taped and floated sheetrock on the north walls by the storage areas, the restrooms, and the southeast stairwell.

 

RESIDENCE HALL LOBBY EXPANSION:

  • The contractor removed existing 2x4 wall-mount light fixtures at the corner of Perdido and S. Roman. 
  • The contractor completed hanging plywood for the temporary wall.