1542    TULANE AVE.:

  • The furniture vendor set up new furniture in Conference Room 544 and in the 5th Floor lounge.
  • The general contractor completed ceiling tile work and carpet work in Rooms 544 and 547. 
  • The moving contractor delivered four truckloads of material for OB-GYN and Urology to the offices on the 5th Floor.
  • The painting contractor completed painting the freight elevator lobby and started work in the rear stairwell. 
  • Facility Services continued minor repairs on various floors.

     

DENTAL CAMPUS AUDITORIUMS A & B RENOVATIONS:

  • The general contractor primed the walls at the stairwell entrance to Auditoriums A and B and installed ceiling grid in Auditorium A.
  • The electrical contractor installed conduit for the new air handling unit.

 

DENTAL 6th & 8th FLOOR LABORATORY RENOVATIONS:

  • The general contractor honed and polished the terrazzo floors in Rooms 6333 and 6335.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The mechanical subcontractor set water fountains on the 6th Floor, S. Prieur St. side.
    • They installed heating hot water pipes on the 6th Floor, Bolivar St. side.
  • The electrical subcontractor wired Panel 2AB and the B riser to the new switchgear.  
  • The fireproofing subcontractor painted the steel structure of the new stairwell, Floors 1 - 3.
  • The sprinkler subcontractor installed sprinkler heads on the 6th Floor, Bolivar St. side.
  • The contractor painted on the 6th Floor, Gravier St. side.
    • They installed ceiling grid in the simulation rooms.
    • Doors were installed on the 6th Floor, Gravier/S. Prieur St. side.
    • Crews installed studs and sheetrock on the 2nd Floor on the CSRB side.
    • Floor tile is being installed in the restrooms on the 1st Floor, S. Prieur St. side.

 

LIBRARY COMMONS:       

  • The contractor installed countertops and shelving for the coffee kiosk.   
  • The contractor continued installing wood panel supports for the columns.
  • The contractor installed perimeter floor tiles in elevator lobby and the restrooms.     

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor removed the ceiling and lab furniture in the large laboratory area.

 

MEB 2ND FLOOR LOBBY RENOVATIONS:

  • The contractor removed obsolete computer wiring in the center of the lobby.

 

MEB MDL 6 RENOVATIONS:

  • The contractor removed floor tiles from Room 4117A. 

 

RESIDENCE HALL LOBBY EXPANSION:

  • The contractor installed horizontal mullions for the new curtain wall below the roof.
  • The contractor patched the plaster ceiling on the Bolivar St. side of the enclosure.