1542 TULANE AVE. :

  • The painting contractor completed work in the rear stairwell.
  • Facility Services continued power washing the Lakeside Lot and continued making minor repairs on various floors.

 

DENTAL CAMPUS AUDITORIUMS A & B RENOVATIONS:

  • The mechanical contractor installed piping for the A/C unit in A/V Room 4202. 
  • The contractor insulated the chilled water supply lines for the auditorium A/C units.

 

DENTAL 6th & 8th FLOOR LABORATORY RENOVATIONS:

  • The general contractor installed blocking for the walls in Rooms 8405C, 8405D, and 8405G. 
  • The contractor honed the terrazzo floor in 8405J and polished the terrazzo in 8405A and 8405J.

 

EXTERIOR/LANDSCAPING:

  • The contractor placed base course for the new concrete sidewalk along the Gravier St. side of the Gravier Garage and continued site work and grading at the corner of Gravier/S. Claiborne.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The mechanical subcontractor installed supply duct on the 6th Floor on the Gravier St./Bolivar St. side.
  • The fireproofing subcontractor painted the exterior beams in the new stairwell Floors 5 and 6.
  • The contractor installed ceiling grid in the middle of the 6th Floor, installed restroom accessories on the 6th Floor (S. Prieur side), installed doors on the 2nd Floor and plastered on the 1st Floor (CSRB/Bolivar side).

 

LIBRARY COMMONS:       

  • The fire alarm subcontractor began rough-in for fire alarm devices.
  • LSUHSC electricians provided power to the air handling unit. 

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor continued removing walls in Rooms 5218, 5218A, 5219, 5220, and 5220A.   

 

MEB 2ND FLOOR LOBBY RENOVATIONS:

  • The contractor touched up the paint after the sprinkler pipe installation.

 

MEB MDL 6 RENOVATIONS:

  • The contractor continued installing piping for hot/cold water and drainage in the 3rd Floor ceiling.

 

RESIDENCE HALL LOBBY EXPANSION

-           The contractor removed two doors between tower A and tower B on Perdido Street side.

-           The contractor installed rubber glazing for the expanded storefront system on Perdido Street to get ready for glass installation.