The general contractor continued installing ceiling tiles on the 4th Floor.
DENTAL
CAMPUS AUDITORIUMS A & B RENOVATIONS:
The flooring contractor prepped the sub-floor in Auditorium B for carpet.
DENTAL
6th & 8th FLOOR LABORATORY RENOVATIONS:
The general contractor installed additional sheetrock and insulation in Room 8405.
EXTERIOR/LANDSCAPING:
The contractor placed formwork and welded wire fabric in preparation for pouring the sidewalk concrete at the corner of Gravier St. and S. Claiborne Ave.
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The mechanical subcontractor installed supply duct on the Gravier St./Bolivar St. side of the 6th Floor.
A crew set fixtures in the restrooms on the 1st Floor, S. Prieur St. side.
The electrical subcontractor installed the last of the ground feeders to the switchgear on the 2nd Floor.
They continued installing cable tray on the CSRB side of the 2nd Floor.
Conduit was run to the fire pump controller on the 2nd Floor.
The sprinkler subcontractor ran pipe to the new fire pump on the 2nd Floor.
The contractor installed grating on the roof platform, installed door frames on the 6th Floor (Gravier/Bolivar side) and painted the walls of the mechanical room on the 2nd Floor.
LIBRARY
COMMONS:
The contractor began installing the ceiling frame above the coffee kiosk.
The contractor continued installing custom wood column covers.
MEB
PHARMACOLOGY LAB RENOVATIONS:
The contractor finished removing all sheetrock on interior walls of the main lab.
MEB
2ND FLOOR LOBBY
The contractor installed sprinkler branch piping on the Bolivar St. side of the lobby.
MEB
MDL 6 RENOVATIONS:
The contractor removed a portion of a block wall for the future partition storage and continued installing sheetrock above the room divider.
RESIDENCE
HALL LOBBY EXPANSION:
The contractor placed two concrete curbs where two doors were removed between the A & B towers.
The contractor installed additional rubber glazing for the expanded storefront system on the Perdido St. side in preparation for glass installation.