Louisiana State University Health Sciences Center Administration & Finance
 

Tuesday, December 23, 2008

 

1542 TULANE AVE.:

  • The general contractor continued installing ceiling tiles on the 4th Floor.
  • Facility Services continued installing new locksets on the 4th Floor doors.

 

DENTAL CAMPUS AUDITORIUMS A & B RENOVATIONS:

  • The flooring contractor installed additional patch for the sub-floor in Auditorium B and began grinding the sub-floor to a level finish in Auditorium A.
  • The general contractor installed the door frame for the new A/V room (4202).

 

DENTAL 6th & 8th FLOOR LABORATORY RENOVATIONS:

  • The general contractor installed door frames for Rooms 8405F and 8405H, and installed the window frame for Room 8405J.

 

EXTERIOR/LANDSCAPING:

  • The contractor poured new concrete sidewalks in the lot at the corner of Gravier St. and S. Claiborne Ave.
  • Facility Services painted new motorcycle/bicycle parking area on the 1st deck of the Roman St Garage.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The mechanical subcontractor installed supply grilles on the 6th Floor, Gravier St./S. Prieur side.
    • They set the AHU on the Bolivar St. Side of the 6th Floor Bolivar and set fixtures in the restrooms on the 1st Floor. S. Prieur St.side.
  • The electrical subcontractor cleaned and megged the switchgear and installed light fixtures and receptacle covers on the 2nd Floor.
  • The fireproofing subcontractor painted the interior beams of the new stairwell on Floors 1 through 3.
  • The sprinkler subcontractor continued installing pipe to the fire pump on the 2nd Floor.
  • The contractor painted the mechanical room on the 2nd Floor. 

 

LIBRARY COMMONS:              

  • The contractor continued installing the ceiling frame above the coffee kiosk.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor finished removing casework from Room 5220 and removed the metal studs separating Rooms 5220 and 5221.    

 

MEB 2ND FLOOR LOBBY RENOVATIONS:

  • The contractor installed additional sprinkler branch piping on the Bolivar St. side of the lobby.
  • The contractor secured the window frames on the Bolivar St. side.

 

MEB MDL 6 RENOVATIONS:

  • The contractor installed sheetrock above the steel track in the main MDL room.

RESIDENCE HALL LOBBY EXPANSION:

  • The contractor installed additional rubber glazing for the expanded storefront system on Perdido St. side.
  • The contractor installed conduits on top of the Residence Hall walkway.