Tuesday, December 9, 2008

 

1542 TULANE AVE. :

  • The general contractor continued painting in Room 545 and installed ceiling tiles in the 5th Floor lounge.
  • The moving contractor delivered furniture and contents for the Dermatology and Anesthesiology departments to their offices on the 6th Floor.
  • The painting contractor continued painting the front stairwell on the Claiborne Avenue end of the front hallway.
  • The terrazzo contractor completed cove base repairs in the front hallways on the 4th through the 7th Floors.
  • Facility Services continued minor repairs on various floors.  

 

DENTAL CAMPUS AUDITORIUMS A & B RENOVATIONS:

  • The general contractor installed the entrance door frame to Auditorium A and cut an opening for a new door in Room 4205.
  • The mechanical contractor installed diffusers and flex duct in Auditorium B.

 

DENTAL CAMPUS 6TH AND 8TH FLOOR LAB RENOVATIONS:

  • The general contractor extended the corridor wall framing to the slab of the deck above. 
  • The contractor applied additional water-proofing mastic to the exterior walls.

 

EXTERIOR/LANDSCAPING:

  • Facility Services continued adjusting landscape edging in the planting beds in front of the Resource Center .

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The mechanical subcontractor installed additional storm drain pipe in the new stairwell and removed existing plumbing piping on the 6th Floor, S. Prieur/Gravier Street side.
  • The sprinkler contractor rerouted sprinkler piping on the 6th Floor, S. Prieur/Gravier Street side.
  • The contractor taped and floated sheetrock on the 6th Floor, S. Prieur/Gravier Street side.
    • They primed the 6th Floor walls on the Gravier/Bolivar Street side and painted marker boards on the Perdido Street side.
    • Crews installed studs and sheetrock in the 2nd Floor electrical room and plastered the 1st Floor CMU wall on the S. Prieur Street side.

 

LIBRARY COMMONS:       

  • The contractor laid additional floor tiles at the Library entrance. 
  • The contractor installed wood supports around two columns for the column covers and install the doorframes for the restrooms.   

 

MEB 2ND FLOOR LOBBY RENOVATIONS:

  • The contractor installed the knife edge ceiling grid trim on the South Roman Street side. 

 

MEB MDL 6 RENOVATIONS:

  • The contractor raised the steel support for the new partition track in the MDL room.

 

RESIDENCE HALL LOBBY EXPANSION:

  • The contractor installed five vertical mullions above the entrance of the Residence Hall.
  • The contractor taped and floated the interior temporary wall.