Louisiana State University Health Sciences Center Administration & Finance
 

Tuesday, January 13, 2009

 

1542 TULANE AVE. :

  • The general contractor continued taping and sanding the drywall in Room 443 and began taping and mudding the drywall in Room 345.
    • They continued patching holes on the 2nd and 3rd Floor and the construction of new walls in the 2nd Floor lounge. 
  • Facility Services installed the sink, refrigerator and the ice machine in the 4th Floor lounge kitchenette and continued installing door hardware on the 3rd and 4th Floors.

 

DENTAL CAMPUS AUDITORIUMS A & B RENOVATIONS:

  • The electrical contractor installed the down lights in Auditorium A.

 

DENTAL 6th & 8th FLOOR LABORATORY RENOVATIONS:

  • The contractor finished installing sheetrock around doorways and service utilities in Room 8405A, 8405D, 8405E, 8405F, 8405G and 8405J.

 

EXTERIOR/LANDSCAPING:

  • The contractor continued installing sprinkler piping and edging in the lot at the corner of S. Claiborne Ave. and Gravier St . 
  • Facility Services mulched and cleaned the planting beds in front of the Allied Health/Nursing Building.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:        

  • The mechanical subcontractor installed and insulated supply duct on the Bolivar St. side of the 6th Floor. 
  • The electrical subcontractor installed lights in the 6th Floor large lecture room and continued roughing in electrical conduit in the old laboratory space. 
  • The sprinkler subcontractor installed sprinkler heads in the center of the 6th Floor. 
  • The contractor installed studs for fur downs on the 6th Floor, Bolivar Street Side.
    • They plastering above the doorframe on the Gravier St./Bolivar St. side of the 1st Floor and continued fireproofing the beams on the 1st through 6th Floors of the stairwell. 

 

LIBRARY COMMONS:

  • The contractor continued install branch ductwork in the small multi media room. 
  • LSUHSC electricians installed light fixtures in the coffee kiosk.

 

MEB 2ND FLOOR LOBBY RENOVATIONS:

  • The flooring contractor began installing tile base.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The general contractor continued to frame walls inside the laboratory area. 

 

RESIDENCE HALL LOBBY EXPANSION: 

  • The contractor continued installing stud frames for the fur-down along the diffusers between Tower A & B.
  • The contractor installed spandrel glass on Perdido Street side.