The general contractor completed taping and sanding the drywall in Room 443.
They continued patching holes on the 2nd and 3rd Floors and framing new walls in the 2nd Floor lounge.
Facility Services painted offices and hallways on the 4th Floor and moved building supplies from Rooms 111, 111A and 111B to Room 313.
DENTAL CAMPUS AUDITORIUMS A & B RENOVATIONS:
The electrical contractor installed the down lights in Auditorium B.
EXTERIOR/LANDSCAPING:
The contractor continued grading the planting beds in the lot at the corner of S. Claiborne Ave. and Gravier St .
Facility Services performed landscape maintenance around campus.
LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:
The mechanical subcontractor connected heating hot water pipes to the VAVs on the 6th Floor, Bolivar Street side.
Additional supply duct was installed and insulated on the Bolivar St. side of the 6th Floor.
The electrical subcontractor installed lights in the large lecture room on the 6th Floor and continued roughing in electrical conduit in the old laboratory space.
The contractor continued framing the soffit on the 6th Floor Bolivar St. side.
Crews installed ceiling tiles in 6th Floor simulation rooms and continued fireproofing the beams on the 1st through 6th Floors of the stairwell.
LIBRARY COMMONS:
LSUHSC electricians installed light fixtures in the cafe.
MEB 2ND FLOOR LOBBY RENOVATIONS:
The flooring contractor installed carpet.
MEB MDL 6 RENOVATIONS:
The contractor set all the light fixtures.
MEB PHARMACOLOGY LAB RENOVATIONS:
The general contractor continued to frame walls inside the laboratory area and started framing walls in the administrative area.
RESIDENCE HALL LOBBY EXPANSION:
The contractor installed exterior mullion trim.
The contractor installed the flashing on the roof.