The general contractor completed painting the walls in Room 443 and began installing the ceiling grid.
Wall framing in the 2nd Floor lounge was completed and drywall installation started on the ceiling fur down.
The build out of the 1st Floor lounge commenced and wall repair continued in the 2nd and 3rd Floor offices.
The lighting contractor installed new light fixtures in Rooms 111, 111A and 111B.
Facility Services continued painting offices and hallways on the 4th Floor.
DENTAL CAMPUS AUDITORIUMS A & B RENOVATIONS:
The electrical contractor installed trim rings for the recessed can light fixtures in Auditoriums A and B.
DENTAL 6th & 8th FLOOR RENOVATIONS:
The contractor sanded and placed the second skim coat on the walls in 6333, 6335, and Suite 8405 .
EXTERIOR/LANDSCAPING:
Facility Services continued installing irrigation piping and sprinklers in the back of the Resource Center .
LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:
The mechanical subcontractor began installing control wire to AHU 6-1.
They tested medical gas outlet boxes in the simulation rooms.
Supply air grills were installed on the CSRB side of the 6th Floor.
Crews continued insulating heating hot water lines on the 6th Floor, Bolivar St. side.
The contractor installed bathroom partitions and drywall on the Bolivar St. side of the 6th Floor.
A crew installed ceiling tiles on 6th Floor, CSRB side.
Ceiling grid was installed on the S. Prieur St. side of the 6th Floor.
They continued painting the exterior stairwell.
The contractor switched the power sources of Riser B which serves the S. Prieur St. electrical receptacles and lights to the new switchgear.
LIBRARY COMMONS:
The contractor installed sheetrock at the stairwell and in the small multi media room.
They taped and floated walls in the Library Commons.
LSUHSC electricians continued installing light fixtures in the cafe.
MEB 2ND FLOOR LOBBY RENOVATIONS:
The contractor installed ceiling grid in the center of the lobby.
MEB MDL 6 RENOVATIONS
The contractor continued relocating sprinkler heads in the main MDL room.
MEB PHARMACOLOGY LAB RENOVATIONS:
The general contractor completed framing the new walls.
The electrical contractor continued to run conduit in the laboratory area.
The mechanical contractor capped hot/cold/deionized water lines on the 4th Floor below the Pharmacology labs.
RESIDENCE HALL LOBBY EXPANSION:
The contractor installed exterior vertical mullion on the Perdido Street side of the lobby.
The contractor continued installing stud framing for the soffit on the corner of S. Roman and Perdido Streets and on the mezzanine level between the A & B Towers .