The general contractor began installing new sprinkler piping in the 2nd Floor lounge.
Crews continued framing walls and fur downs in the 1st Floor lounge and patching holes in offices on the 2nd and 3rd Floors.
The mechanical contractor continued piping new fan coil units on the 2nd and 3rd Floors.
LSUHSC Facility Services continued painting offices and hallways on the 4th Floor and pressure washing the Lakeside Lot.
DENTAL
6th & 8th FLOOR RENOVATIONS:
The contractor completed installing ceiling tiles on the 6th and 8th Floors.
EXTERIOR/LANDSCAPING:
The contractor continued planting shrubs and began installing the new fence around the well at the corner of Gravier St. and S Claiborne Ave.
LSUHSC Facility Services continued installation of irrigation piping behind the Resource Center at the corner of S. Prieur and Gravier Sts.
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The contractor continued installing curtain wall mullions on the 2nd through 5th Floors of the exterior stairwell.
The contractor continued installing studs for the fur down in the 6th Floor elevator lobby and work on the Reception Center fur down the 6th Floor.
A crew continues to clean the stone floors on the 1st Floor.
The electrical subcontractor pulled more wire for receptacles on the 6th Floor.
They ran additional conduit and pulled wire for lights on the 6th Floor, Gravier St./Bolivar St. side.
Electricians continue to run conduit on the 9th Floor from the hallway to room 908.
The mechanical subcontractor insulated chill water supply and return lines on the 1st Floor, Bolivar Street side.
A crew continues installing fire dampers on the 2nd Floor.
LIBRARY
COMMONS:
LSU electricians completed installing the lights above the coffee kiosk.
MEB
MDL 6 RENOVATIONS:
The contractor completed installing VCT tiles in the corner rooms.
MEB
PHARMACOLOGY LAB RENOVATIONS:
The general contractor continued hanging sheetrock in the administrative area and taping and floating the lab area.
The electrical contractor pulled wire in the administrative area.
MEB
2nd FLOOR LOBBY RENOVATIONS:
The contractor painted underneath the store front windows and installed the metal frame for the exterior sliding glass door on the Bolivar Street side.
RESIDENCE
HALL LOBBY EXPANSION:
The interior contractor continued installing linear diffusers in the corner lobby.
The mechanical contractor installed hard duct near Elevator B and ran roof drain pipes near the walkway.