Louisiana State University Health Sciences Center Administration & Finance
 

Tuesday, February 17, 2009

 

1542 TULANE AVE. :

  • The general contractor continued patching holes in offices on the 2nd and 3rd Floors. 
  • The electrical contractor completed installing new light fixtures in the 3rd Floor lounge. 
  • The mechanical contractor continued piping new fan coil units on the 2nd and 3rd Floors. 
  • The painting contractor continued patching holes and priming walls in offices on the 3rd Floor. 
  • Facility Services continued repairs on the 3rd Floor and installing new door hardware on the 2nd and 3rd Floors.

 

DENTAL 6th & 8th FLOOR RENOVATIONS:

  • The contractor touched-up the paint and prepped the floor for final cleaning and polishing in Suite 8405 .

 

EXTERIOR/LANDSCAPING:

  • Facility Services laid sod in front of 1542 Tulane Avenue and behind the Resource Center .

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The mechanical subcontractor installed fuel lines in the east hallway on the Bolivar St. side of the 9th Floor.
    • They pressure tested both fuel lines in the Bolivar St. pipe chase. 
  • The contractor taped and floated the walls of the hallway on the Bolivar St. side of the 6th Floor.
    • A crew taped and floated the fur down in the old lab area on the 6th Floor.
    • They painted the hallway on the Gravier St. side of the 6th Floor and installed metal studs for the new stairwell wall on the 6th Floor, Gravier Street side.
    • The granite floor on the 1st Floor, Gravier/Bolivar St. side was cleaned.
    • Workers continued installing 6th Floor and roof curtain wall mullions on the exterior stairwell and welded the metal roof decking for the roof of the new stairwell. 
  • The electrical contractor mounted disconnects for the fire pump and EMDP panel on the roof.
    • They installed wire to the VAV on the 6th Floor, Bolivar St. side.
    • Electricians installed lights in the middle simulation lab on the 6th Floor and installed the light panel on the 6th Floor, S. Prieur Street side.

 

LIBRARY COMMONS:

  • LSUHSC electricians installed the spot lights in the study areas.  
  • The painting contractor touched up conduit in the black ceiling area. 

 

MEB MDL 6 RENOVATIONS:

  • The casework contractor installed countertops for the cabinet sinks.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor moved sprinkler pipe above the suspended ceiling and removed and capped the old sprinkler pipe on the Bolivar Street side.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor installed doorframes in the department head office and in the lab area.
    • They continued taping and floating the lab area. 
  • The electrical contractor continued running lighting circuits in the lab area. 

 

RESIDENCE HALL LOBBY EXPANSION: 

  • The interior contractor furred out the sheetrock wall where the old mailboxes were located.
    • Crews started framing the fur down in the expanded lobby area and continued installing ceiling grid in the back corner of the Bolivar/Perdido Street side.
  • The electrical subcontractor roughed in the floor boxes in the expanded lobby area.