1542 TULANE AVE. :

  • The mechanical contractor continued piping new fan coil units on the 3rd Floor. 
  • The painting contractor continued priming and painting offices on the 3rd Floor. 
  • Facility Services continued repairs on the 3rd Floor, connecting electrical service for fan coil units, and installing new door hardware on the 2nd and 3rd Floors.

 

EXTERIOR/LANDSCAPING:

  • Contractor laid sod along S. Claiborne Ave. adjacent to the Gravier St. garage.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The mechanical subcontractor continued installing fuel lines in Room 901. 
  • The contractor painted the passenger elevator lobby on the 6th Floor.
    • They installed laminate on the fur down on the Gravier St./Bolivar St. side of the 6th Floor.
    • Crews continued to clean the granite floor tile on the 1st and plaster CMU walls on the Bolivar St. side of the 1st Floor.
    • Others installed bathroom partitions on the 1st Floor, S. Prieur Street side.
    • Mullions and corners were installed on the 1st and 2nd Floors of the new stairwell.  
  • The sprinkler contractor installed sprinklers in the passenger elevator lobby on the 6th Floor.

 

LIBRARY COMMONS:

  • The contractor installed ceiling tiles in the study area. 
  • A crew patched and painted the fur down above the coffee kiosk. 
  • The contractor continued floating the composite wall panels.

 

MEB MDL 6 RENOVATIONS:

  • The AV contractor installed LCDs.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor installed three doorframes in the administration area. 
  • The contractor demolished a portion of the exterior corridor wall in order to install a doorframe in the lab area. 
  • They continued to paint the lab area.

 

RESIDENCE HALL LOBBY EXPANSION: 

  • The interior contractor continued installing grid in the back lobby area.
  • The enclosure contractor installed additional break metal to cover the roof drain pipes on both sides of the walkway.

 

DENTAL 6th & 8th FLOOR RENOVATIONS:

  • The contractor placed structural components of the laboratory casework in Room 8405A.

 

DENTAL AUDITORIUMS A & B RENOVATIONS:

  • The contractor continued demolishing the wing walls in Auditoriums A and B.

      

ALLIED HEALTH/NURSING ROOF REPLACEMENT:

  • The contractor completed installation of the temporary exterior elevator.