Wednesday, February 4, 2009

 

1542 TULANE AVE. :

  • The general contractor continues taping and floating the drywall in the 2nd Floor lounge and framing walls and fur downs in the 1st Floor lounge.
    • Crews are removing the old sprinkler piping from both lounge areas and continue patching holes in offices on the 3rd Floor.
  • The mechanical contractor continues to pipe in new fan coil units on the 2nd and 3rd Floors. 
  • The network wiring crew continues the installation of new network drops on the 4th Floor. 
  • LSUHSC Facility Services continued painting offices and hallways on the 4th Floor.

 

DENTAL 6th & 8th FLOOR RENOVATIONS:

  • The electrical contractor installed light switches and duplex receptacles in Suite 8405A - 8405K, and installed light fixtures in Room 6335. 
  • The painting contractor primed and applied the first coat of paint on the door frames in Suite 8405A - 8405K. 
  • The insulation contractor insulated the duct taps in Room 8405A.

 

EXTERIOR/LANDSCAPING:

  • LSUHSC Facility Services finished installing landscape edging around the Resource Center planting bed at the corner of Bolivar St . and Gravier St .
  • The crew installed irrigation piping and sprinklers and filled in the open trenches.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:        

  • The contractor installed window frames in the 6th Floor simulation room on the Bolivar St./Gravier St. side of the floor.
    • They finished laying the mud bed for the tile in the 6th Floor elevator lobby.
    • Sheetrock was hung in the 6th Floor elevator lobby.
    • A crew taped and floated the sheetrock on the Bolivar St./Gravier St. side of the 6th Floor.
    • The vertical steel has been installed on the 1st and 2nd Floors of the exterior stairwell.
    • The horizontal steel was installed on the 1st through 4th Floors of the new stairwell. 
  • The sprinkler subcontractor installed sensor lines to the fire pump controller on the 2nd Floor, CSRB side.  
  • The electrical subcontractor pulled wire for the electrical outlets and switches on the 6th Floor, Gravier/Bolivar Street side and installed conduit to the generator in Room 908.
  • The mechanical subcontractor insulated heating hot and chill water lines in the mechanical room on the 6th Floor, Bolivar Street side.
    • They installed fire dampers on the 2nd Floor and installed control wire to AHU 1-4 in the mechanical room on the 1st Floor.

 

MEB MDL 6 RENOVATIONS:

  • The contractor is installing new VCT tiles in the main MDL room.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The general contractor continued began taping and floating sheetrock in the laboratory area. 
  • The electrical contractor started pulling wire in the laboratory area. 
  • The mechanical contractor installed waste water pipes below the administrative area. 

 

MEB 2nd FLOOR LOBBY RENOVATIONS: 

  • The contractor finished the storefront wall under the window frames. 
  • They continue painting the sprinkler pipes above the exposed ceiling. 

 

RESIDENCE HALL LOBBY EXPANSION:

  • The interior contractor began installing ceiling grid in the lobby between the A & B Towers .
  • They continued framing and installing sheetrock in the Perdido St./Bolivar St. corner of the lobby.