  • The general contractor continued painting in Room 109H and continued drywall and ceiling work in Rooms 111 and 111A. 
  • The electrical contractor continued electrical rough-in in the 1st Floor lounge.
  • The painting contractor continued painting offices on the 2nd Floor. 
  • Facility Services continued repairs on the 1st Floor and installing thermostats for fan coil units on the 3rd Floor.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION: 

  • The contractor load tested the roof top generator. 
    • The contractor continued placing concrete forms for the freight elevator floodproofing wall.
    • Crews continued installing exterior granite on the 2nd level of the new stairwell.
    • They continued installing carpet in the large conference room, floor tile in the elevator lobby on the 6th Floor and VCT flooring in the hallways between the simulation rooms.
    • The contractor began installing fire rated wall on the 5th Floor for the new stairwell.
  • The mechanical contractor tied in the medical air/gas/vacuum to the Stryker equipment in the simulation rooms and installed the building management system in the 6th Floor Bolivar Street side mechanical room. 
  • The electrical contractor installed lights in the computer lounge and above the receptionist desk.

 

LIBRARY COMMONS:

  • The contractor completed installing the new ceiling baffles.
  • The contractor began installing the magazine rack in the study area.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor continued installing light fixtures.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor modified sprinkler heads in the lab area. 
  • The flooring contractor leveled the floor.

 

RESIDENCE HALL LOBBY EXPANSION:

  • The contractor taped and floated the fur down in back lobby area of Tower A.
  • The contractor began relocating sprinkler heads.

 

DENTAL 6th & 8th FLOOR LAB RENOVATIONS:

  • The network wiring crew installed the wiring in Rooms 8405H, 8405I, and 8405J.
  • The electrical contractor installed receptacles for the peninsulas in 8405A and 8405B.

 

ALLIED HEALTH/NURSING ROOF REPLACEMENT:

  • The contractor removed the lightweight concrete roofing system from the elevator penthouse and began installing foam insulation.