Louisiana State University Health Sciences Center Administration & Finance
 

Monday, March 2, 2009

 

1542 TULANE AVE. :

  • The furniture contractor completed the installation of new cabinetry in the 3rd Floor lounge. 
  • The mechanical contractor continued installing new fan coil units on the 3rd Floor.
  • The plumbing for the 2nd Floor lounge was completed.
  • The painting contractor continued painting offices on the 3rd Floor.
  • Facility Services continued repairs on the 1st and 3rd Floors, painting hallways on the 3rd Floor, and connecting electrical service for fan coil units.

 

EXTERIOR/LANDSCAPING:

  • Facility Services graded planting bed in the rear of the Resource Center .

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:    

  • The contractor started installing exterior glass on the new exterior stairwell. 
  • The mechanical contractor installed fuel pipes on the 1st Floor, CSRB side and installed control wire to the AHU on the 1st Floor, Bolivar Street side. 
  • The contractor installed ceiling grid on the 6th Floor, Gravier Street side.
  • The electrical contractor installed conduit from the switches to the disconnects for the generator on the roof.
    • They installed light fixtures on the 6th Floor, Gravier Street side and installed additional wire for the Stryker equipment that will be installed for the simulation labs. 

 

LIBRARY COMMONS:

  • LSUHSC electricians pulled wire for receptacles. 
  • The contractor continued installing the display case in the elevator lobby.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor painted the metal doors for the lecture halls and the stairwells, painted all the door frames and continued installing break metal around the elevator doors. 

 

MEB MDL 6 RENOVATIONS:

  • The network wiring contractor continued terminating data ports.
  • The electrical contractor continued installing light switches and receptacles. 
  • The casework contractor installed countertops. 

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor primed and patched the walls in the administrative area.

 

RESIDENCE HALL LOBBY EXPANSION:

  • The contractor laid one layer of the mortar bed. 

 

DENTAL 6th & 8th FLOOR LAB RENOVATIONS:

  • The contractor continued installing cabinets and countertops for lab benches.