MONDAY, MARCH 23, 2009

 

1542 TULANE AVE. :

  • The general contractor continued painting in Rooms 109H, 111 and 111A and continued ceiling work in Room 111.
    • Workers continued demolishing the plaster ceiling in Rooms 341, 342 and 343.
  • The furniture vendor arranged furniture in offices on the 3rd Floor.
  • The mechanical contractor continued installing fan coil units in offices on the 3rd Floor.
  • The painting contractor completed painting offices on the 2nd Floor.
  • Facility Services continued repairs on the 1st and 3rd Floors.

 

EXTERIOR/LANDSCAPING

  • Facility Services began installing irrigation piping in the rear of the Resource Center along S. Prieur St .

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:   

  • The contractor installed floor tile in the 6th Floor elevator lobby.
  • Carpet is being installed in the computer lounge.
  • Plaster is being applied on the 1st Floor, Bolivar Street side.
  • Workers hung restroom doors on the 1st Floor, Bolivar and S. Prieur Street sides.
  • The electrical contractor installed conduit for the new stairwell lighting.
    • They ran wire mold in the computer lounge. 

 

LIBRARY COMMONS:

  • The contractor continued installation of shelving in the new display cases.
  • The fire extinguisher cabinet was installed in the Womens restroom. 
  • LSUHSC Facility Services electricians began installing light fixtures inside the new display cases. 

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor continued installing outlets along the walls and lights in the area between the two automatic doors.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor continued modifying sprinkler heads in the administrative area. 
  • The contractor continued roughing in the plumbing and med gas for the administrative area. 

 

RESIDENCE HALL LOBBY EXPANSION: 

  • The contractor continued framing and installing sheet rock for the fur down in the expanded lobby area.
  • The contractor patched and skimmed plaster wall in the A Tower lobby area.

 

DENTAL 6th & 8th FLOOR RENOVATIONS:

  • The mechanical contractor installed ductwork to the fume hood on the 8th Floor and installed med air, gas and vacuum valves on the 8th Floor. 

 

ALLIED HEALTH/NURSING ROOF REPLACEMENT:

  • The contractor completed the installation of the two-ply roof on the elevator penthouse and the stairwell penthouse.