The general contractor continued painting in offices on the 3rd Floor.
Crews began the demolition and reconfiguration of Rooms 109, 341, 342 and 343.
The granite contractor repaired two holes in the granite walls on the 1st Floor.
The mechanical contractor continues installing new fan coil units on the 3rd Floor.
The painting contractor continues painting offices on the 3rd Floor.
LSUHSC Facility Services continues making repairs on the 1st and 3rd Floors, painting hallways on the 3rd Floor, and connecting electrical service for new fan coil units.
EXTERIOR/LANDSCAPING:
LSUHSC Facility Services continued graded the planting bed and preparing for planting in the rear of the Resource Center .
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The contractor continues installing exterior glass on the new exterior stairwell.
They are installing metal studs for the wall around the fire door on the 6th Floor, Gravier Street side.
The mechanical contractor continued installing fuel pipes on the CSRB side of the 1st Floor.
The electrical contractor installed conduit for the control wires to the diesel fuel tank from the generator on the roof.
They are installing lights on the Bolivar St. side of the 6th Floor and conduit for control wires on the 1st Floor, CSRB side.