Louisiana State University Health Sciences Center Administration & Finance
 

Tuesday, March 3, 2009

 

1542 TULANE AVE. :

  • The general contractor continued painting in offices on the 3rd Floor.
    • Crews began the demolition and reconfiguration of Rooms 109, 341, 342 and 343.
  • The granite contractor repaired two holes in the granite walls on the 1st Floor. 
  • The mechanical contractor continues installing new fan coil units on the 3rd Floor.
  • The painting contractor continues painting offices on the 3rd Floor.
  • LSUHSC Facility Services continues making repairs on the 1st and 3rd Floors, painting hallways on the 3rd Floor, and connecting electrical service for new fan coil units.

 

EXTERIOR/LANDSCAPING:

  • LSUHSC Facility Services continued graded the planting bed and preparing for planting in the rear of the Resource Center .

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The contractor continues installing exterior glass on the new exterior stairwell.
    • They are installing metal studs for the wall around the fire door on the 6th Floor, Gravier Street side. 
  • The mechanical contractor continued installing fuel pipes on the CSRB side of the 1st Floor.
  • The electrical contractor installed conduit for the control wires to the diesel fuel tank from the generator on the roof.
    • They are installing lights on the Bolivar St. side of the 6th Floor and conduit for control wires on the 1st Floor, CSRB side.

 

LIBRARY COMMONS:

  • The contractor installed air conditioning diffusers in the multimedia rooms and the café area. 
  • They continue to seal the composite wall panels in the multimedia rooms.
  • The contractor continued installing the display case in the elevator lobby and complete the column wrap in the café area.

 

MEB MDL 6 RENOVATIONS:

  • The network wiring contractor continues to terminate data ports.
  • The electrical contractor continues installing light switches and receptacles.
  • The A/V contractor installed controller boxes in the pedestal island.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor primed and patched the walls in the administrative area.

 

RESIDENCE HALL LOBBY EXPANSION: 

  • The contractor laid the second mortar bed layer in the two corner lobby areas. 
  • The contractor installed brick pavers on the exterior side of the sliding doors.
  • The contractor continued framing the fur down in the expanded lobby area.

 

DENTAL SCHOOL A and B AUDITORIUM RENOVATIONS:

  • The contractor removed the exhaust chase in the IT room.
  • The contractor framed the new wing wall in Auditorium B. 

 

DENTAL 6th & 8th FLOOR LAB RENOVATIONS:

  • The contractor continued installing the new cabinets and countertops for the lab benches.