Louisiana State University Health Sciences Center Administration & Finance
 

Friday, March 6, 2009

 

1542 TULANE AVE. :

  • Facilities personnel demolished fan coil units and associated piping in Rooms 109H, 110, 111, 341, 342 and 343.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:    

  • The contractor installed carpet on the CSRB side of the 6th Floor.
    • Crews installed ceiling wires and grid on the 6th Floor in the computer lounge area.
    • They continued installing the wall around the new roll up fire door on the 6th Floor.
    • Exterior glass continues to be installed on the exterior of the new stairwell. 
  • The mechanical contractor roughed in the waste and water lines for the restroom on the Bolivar St. side of the 1st Floor,
    • They tested all of the diesel fuel lines that run from the roof to the 1st Floor.
    • Crews continued installing fuel pipes on the CSRB side of the 1st Floor.
    • They continue installing supply and return grilles on the 6th Floor, Gravier Street side.
  • The sprinkler contractor continued installing sprinkler heads on the 6th Floor, Gravier Street side.

 

LIBRARY COMMONS:

  • The contractor finished installed the new window shades. 
  • They continue to paint the composite wall panels in the small multimedia room and install the wooden ceiling trim in the study area.
  • The installation of the display cases at the feature wall is proceeding.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor installed sheetrock around the new door frames.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor continued painting in the administration area.

 

RESIDENCE HALL LOBBY EXPANSION: 

  • The mechanical contractor began running sprinkler pipes in the expanded lobby area. 
  • The flooring contractor applied primer and another layer of leveling concrete in the expanded lobby area.

 

DENTAL SCHOOL A and B AUDITORIUM RENOVATIONS:

  • The contractor sanded and prepped the new wing walls in Auditoriums A & B for painting.

 

DENTAL 6th & 8th FLOOR LAB RENOVATIONS:

  • The contractor installed base cabinets and rolling tables for the lab furniture in Rooms 8405C, 8405D, 8405F, and 8405G.
  • Crews installed base cabinets and countertops in Room 6335 and installed new laminated wall panels in the corridor to close the original door opening.

 

DENTAL SCHOOL BOILER INSTALLATION:

  • The contractor installed the electrical disconnect for new boiler and fabricated additional gas and steam piping for connecting the boiler to the building systems.

 

ALLIED HEALTH/NURSING ROOF REPLACEMENT:

  • The contractor continues to remove the old ballast (gravel) from the roof.