Louisiana State University Health Sciences Center Administration & Finance
 

MONDAY, APRIL 13, 2009

 

1542 TULANE AVE. :

  • The general contractor continued finishing the drywall in Rooms 341, 342 and 343.
    • They completed painting the walls and installing ceiling tiles in the 2nd Floor lounge.
  • The access control contractor continued installation of door contacts and panic bars on the emergency exit doors on the Charity side of 1st Floor hallway.
  • The flooring contractor installed carpet in offices on the 2nd Floor and in the 3rd Floor lounge.
  • The network wiring contractor continued installing new drops in the 3rd Floor offices.
  • LSUHSC Facility Services continued painting and making electrical repairs on the 2nd and 3rd Floors.

 

EXTERIOR/LANDSCAPING:

  • LSUHSC Facility Services continued installing irrigation piping at the corner of Perdido St. and S. Roman St .

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The contractor began installing ceramic tile near Bolivar Street on the 1st Floor.
    • Workers installed cove base in the new mechanical rooms on the 2nd Floor.
    • Window blinds are being hung in windows on the 6th Floor.
  • The electrical contractor installed lights on the Gravier St. side of the 6th Floor.
    • They installed conduit in the freight elevator pit.

 

LIBRARY COMMONS:

  • The contractor installed smoke detectors. 
  • Creative Presentations started installing the new A/V equipment.
  • Workers continued hanging wall covering.

 

MEB 2nd FLOOR LOBBY RENOVATION:

  • The contractor installed the new storefront frames at the Medical Center Stores location.   

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The casework contractor continued installing countertops in Rooms 5219, 5219A and 5262. 
  • The new door frame was installed in Room 5219.  

 

RESIDENCE HALL LOBBY EXPANSION: 

  • The interior contractor continues to tape and float the fur down in the expanded lobby area. 
  • The interior contractor installed ceiling tiles between A & B tower lobby.

  

    DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The electrical contractor installed conduit in the elevator lobby outside Auditoriums A & B for the A/V wiring and connections.
  • Creative Presentations installed speaker wiring and structural supports for the projector mounts in Auditorium B.