Louisiana State University Health Sciences Center Administration & Finance
 

WEDNESDAY, APRIL 15, 2009

 

1542 TULANE AVE. :

  • The general contractor painted the walls in Rooms 341, 342, and 343.
    • They continue installing drywall in the 1st Floor lounge.
  • The electrical contractor is installing wiring for ceiling lights in the 1st Floor lounge.
  • The State Elevator Inspector cleared the final items on Elevators 1, 2 and 3 and certified them for normal use.
  • The furniture vendor installed desks and file cabinets in Room 111.
  • The network wiring contractor continued installing new drops in Rooms 111 and 111A.
  • LSUHSC Facility Services electricians continue making miscellaneous electrical repairs on the 1st and 2nd Floors.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:    

  • The contractor finished installing wall covering in the computer lounge.
    • Workers are installing additional glass in the stairwell.
    • They are touching up paint throughout the 6th Floor.
    • Room signs are being installed on the 6th Floor.
    • Sprinkler heads are being installed on the Gravier St. side of the 6th Floor.
    • Crews installed tile floor on the Bolivar St. side of the 1st Floor.
    • Granite pavers are being laid around the new stairwell.
    • Painters primed the CMU walls of the mechanical rooms, electrical rooms, and stairwells on the 1st Floor.
  • The electrical contractor trimmed out and tested the fire alarm devices on the 6th Floor.
    • They installed lights in the 1st Floor restrooms and receptacles on the Prieur St. side of the 1st Floor.
    • Conduit was run from the 6th Floor to the 2nd Floor demark (telephone) room for the 200 pair cable.
    • Conduit was run for the sump pump in the freight elevator.

 

LIBRARY COMMONS:

  • The contractor installed ceiling trim above the coffee kiosk.
  • LSUHSC electricians installed light fixtures near the decorative screens and installed the faceplates for the network drops.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The casework contractor hung overhead shelves. 
  • The contractor hooked up plumbing underneath the casework in Room 5219.
  • VCT was installed in the administrative area. 

 

ALLIED HEALTH/NURSING RE-ROOFING:

  • The contractor removed debris from the roof. 

 

RESIDENCE HALL LOBBY EXPANSION: 

  • The interior contractor continued taping and floating the fur down in the expanded lobby area. 
  • Ceiling tiles are being installed between the A & B Tower lobbies.

 

DENTAL SCHOOL AUDITORIUM A & B RENOVATIONS:

  • The electrical contractor installed additional conduit in the elevator lobby extending into the crosswalk.  This will support the Creative Presentations equipment installation.