The general contractor continues installing the ceiling grid in Rooms 341, 342 and 343.
They continue finishing the new drywall in the 1st Floor lounge.
The walls in the auditorium are being primed.
Repairs to the 3rd Floor hallway ceiling grid are underway.
The cleaning contractor began cleaning offices along the center hallway on the 3rd Floor.
The network wiring contractor completed installing new data drops on the 3rd Floor.
The roll-up door contractor completed the punch list items and made final adjustments to the parking garage roll-up door.
Facility Services continued making electrical repairs on the 1st and 3rd Floors.
They finished installing new locks and hardware on Rooms 110, 111 and 111A.
Crews continued painting the 3rd Floor.
EXTERIOR/LANDSCAPING:
LSUHSC Facility Services completed installing irrigation piping and sprinklers and began grading the planting beds at the corner of S. Roman St. and Perdido St .
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The contractor placed epoxy on the S. Prieur and CSRB sides of the 1st Floor.
Crews installed wall and floor tile on the Bolivar St. side of the 1st Floor.
They installed restroom tile on the 1st Floor Bolivar St. side of the building.
Workers framed and sheet rocked the shaft walls of the new stairwell on the 5th and 6th levels.
A crew continued to install granite pavers at the base of the exterior stairwell.
Works are insulating the new stairwell.
The electrical contractor ran wire from the controller to the motor for the fire pump.
They rewired the tamper proof switches for the fire pump controller and removed the tombstones in the simulation room on the 6th Floor.
LIBRARY
COMMONS:
The furniture contractor began placing the new furniture.
The contractor began removing the restroom partitions.
The contractor continued repairing the custom furniture.
LSUHSC Facility Services electricians installed lights in the coffee kiosk.
MDL-3
RENOVATIONS:
The contractor demolished ceiling grids and tiles, removed light fixtures, and disconnected receptacle outlets.
The A/V contractor de-installed the old LCD and speakers in the main MDL lab area.
MEB
2nd FLOOR LOBBY RENOVATIONS:
The contractor installed the fur down across from the elevators and removed the loose wire in the open ceiling areas.
The wall panel contractor installed wall panels along the Medical Center Stores wall.
MEB
PHARMACOLOGY LAB RENOVATIONS:
The casework contractor completed touch up work to the casework in the administrative and lab areas.
The plumbing contractor continued installing the sinks in the administrative area.
The contractor applied the final coat of paint in the department head’s office.
ALLIED
HEALTH/NURSING RE-ROOFING PROJECT:
The contractor installed insulation and a cap on a 40-foot section of the roof parallel to Perdido Street .
RESIDENCE
HALL LOBBY EXPANSION:
The interior contractor hung ceiling wires in the expanded lobby area.
They prepared the concrete wall to in-set the wall-mounted fire alarm devices.
DENTAL SCHOOL
AUDITORIUM A & B RENOVATIONS:
The electrical contractor installed additional conduit and junction boxes in the crosswalk outside Room 4202.