NOTICE:On Saturday, April 4th, from 6:00 AM to 3:00
PM there will be a de-ionized water outage in the Clinical Sciences Research Building .This outage is needed to repair the
system.During the outage, please do not
attempt to use any DI water.
1542 TULANE AVE. :
The general contractor continued hanging drywall in Rooms 341, 342, and 343 and painting the 2nd Floor lounge.
The mechanical contractor continued installing the new fan coil unit in Room 345A.
The electrical sub-contractor continued wiring fan coil units on the 3rd Floor.
The roll-up door contractor continued installation of the new parking garage roll-up door.
Facility Services continued painting and completing electrical repairs on the 1st and 3rd Floors.
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The contractor installed VCT in the 6th Floor elevator lobby, adjacent storage room and housekeeping closet.
The contractor installed windows on the 5th Floor of the exterior stairwell.
The contractor installed granite panels on the 6th Floor of the exterior stairwell.
The contractor installed the 1st layer of stucco under the canopy of the exterior stairwell.
The contractor installed trim at the header of marker boards in Rooms 671,673, 675, 676,677, 678, 681, 682, and 683.
The contractor installed the 1st coat of waterproofing in the freight elevator pit.
LIBRARY
COMMONS:
The contractor started cleaning the area.
MEB
2nd FLOOR LOBBY RENOVATIONS:
The contractor sanded the storefront walls.
MEB
PHARMACOLOGY LAB RENOVATIONS:
The casework contractor continued installing the peninsular casework in Room 5219 and replaced two of the four fume hoods.
The contractor installed three door frames in the administrative area.
RESIDENCE
HALL LOBBY EXPANSION:
The interior contractor installed sheetrock, taped and floated the fur down in the mezzanine level between the B & C Towers .
ALLIED
HEALTH/NURSING RE-ROOFING:
The contractor removed another 30 ft section of the roof parallel to Bolivar Street and applied the two-ply roof.
DENTAL SCHOOL
AUDITORIUMS A & B RENOVATIONS:
The electrical contractor continued installing additional overhead conduit for the podium, speaker, and projector connections in Auditorium B, extending the conduit into the lobby area.