Louisiana State University Health Sciences Center Administration & Finance
 

FRIDAY, MAY 1, 2009

 

1542 TULANE AVE. :

  • The general contractor finished installing carpet and cove base in Rooms 341, 342 and 343.
    • A crew painted the rear elevator lobby on the 2nd Floor.
  • The electrical contractor installed ceiling lights in the 1st Floor lounge. 
  • The furniture vendor installed furniture in the 3rd Floor lounge and conference room, and in offices on the 3rd Floor.
  • Facility Services continued making electrical repairs and painting on the 3rd Floor.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:    

  • The contractor continued installing window trim for the stairwell on the 6th level and patching sheetrock inside the stairwell on the lower floors.

 

RESIDENCE HALL LOBBY EXPANSION:

  • The interior contractor continued patching walls where the fire alarm devices were installed in the lobby.
    • They framed the network closets in the expanded lobby area.
  • The mechanical contractor continued running wires for pull stations and fire alarm devices in the extended lobby area.

 

MEB MDL 3 RENOVATIONS:

  • The contractor continued raising the support beam for the partition and installing electrical MC cables for light fixtures.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor finished installing the remainder of the surface mount lights. 
  • The wall panel contractor continued installing wall panels on the Campus Office Stores side of the lobby.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor continued installing receptacle raceways in the laboratory area.

 

ALLIED HEALTH/NURSING RE-ROOFING PROJECT:

  • The contractor cut the roof drains on the walkway. 
  • They attached the roofing membrane to the metal roof. 

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The contractor installed ceiling tiles in Auditoriums A and B. 
  • The electrical contractor installed the conduit for the transformers that will provide electrical services in the auditoriums.