The contractor applied the first coat of paint on the walls in the 1st Floor lounge.
Workers wired fan coil units in 3rd Floor offices along Tulane Ave.
The sprinkler contractor repaired an air leak in the dry pipe system on the roof.
LSUHSC Facility Services continued making electrical repairs and painting on the 2nd and 3rd Floors.
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The electrical contractor installed LED lights on the 6th Floor in the computer lounge and at the reception desk.
Duct detectors were installed for the AHU on the Bolivar St. side of the 1st Floor.
Electricians installed switches on the S. Prieur St. side of the 1st Floor.
The contractor glazed the stairwell window jambs for Floors 1 and 2.
Workers installed ceiling grid and tile in the 9th Floor rooms on the CSRB side of the building.
Sheet vinyl flooring has been installed in the simulation rooms on the 6th Floor.
LIBRARY
COMMONS:
The contractor installed doors and door hardware in the restrooms.
MEB
AIR HANDLING UNIT REPLACEMENT:
The contractor completed insulating rooftop unit #1 and continued insulating unit #2.
AHU 6-D and 7-D were delivered.
RESIDENCE
HALL LOBBY EXPANSION:
The interior contractor continued taping and floating new walls throughout the lobby.
Recessed light fixtures were installed in the underside mezzanine sheetrock ceiling between the B & C Towers .
MEB
2nd FLOOR LOBBY RENOVATIONS:
The contractor installed wooden panels near the Mens restroom and the elevators.
MEB
PHARMACOLOGY LAB RENOVATIONS:
The network wiring contractor continued pulling network wires in the lab area.
The contractor is installing wire molding in the lab area.
ALLIED
HEALTH/NURSING BLDG. RE-ROOFING PROJECT:
The contractor continued replacing the parapet wall cap along the MEB loading dock side of the roof.
DENTAL SCHOOL
AUDITORIUMS A & B RENOVATIONS:
The contractor installed additional sheetrock above the ceiling in Room 4202B.
The electrical contractor pulled wires from the main electrical panel to the new 75 KVA and 112 KVA transformers and sub-panels.
The flooring contractor installed additional carpet for the riser seating in Auditorium B and prepped the sub-floor of the lower level in Auditorium A.